Skip to content

The dumpster came!

  • by

03-24-08_NDX_0414

03-24-08_NDX_0416

We’ve been wanting to redo/cleanup the basement for a very long time, but it’s one of those projects that gets put off until you have no choice. Justin has been pushing us to get a dumpster all winter so he could start at it.

OK Justin, it’s here. Go for it.

Unfortunely we can’t turn Justin loose without a little direction. Everything that we didn’t have a place for upstairs, went into the basement…for the last 13 years. We have a few things to go through.

Justin made significant headway on Saturday afternoon, knocking down the old wallboard. All of this has to go up the steps and out the back door to the dumpster. This is where the old stove sat. It was huge: two full-size ovens, 6 burners and a griddle on top.

After Justin clears out everything, we’ll have another 1400-1500 square feet to play with. We will be building a few sets with a warehouse feel to it for seniors.

Tags: